Select Page

Pond

Having used drainage rods to clear the overflow outlet pipe which should run into the Stanner, we encountered a total collapse after approximately 30 yards, under the tarmac opposite the cheese shop garden. This will clearly require the road digging up and new drainage to replace the current pipe.

Currently at the point of collapse water is finding its way to the surface and bubbling up through small holes in the road tarmac. It then runs down to the existing drain at the corner of Stonewell Lane and is disposed through the normal storm drainage system.

As a result of clearing the silt within the pipe, water flow through the tarmac increased slightly and overnight the pond level has dropped to the level of the overflow – exactly as it should.

Clearly however this is not an ideal situation and we have now contacted DCC who are responsible for both Flood Issues and Road repairs. Hopefully they will respond.

Hartington Pond

Having renovated the pond, we now find the outlet to release high water is blocked somewhere between the pond and the Stanner.

We have now rodded the outlet from within the pond to midway to the Stanner where there is a complete blockage and the drain has collapsed. The rodding has cleared much of the silt and water is gradually seeping through the tarmac opposite the Cheese Shop and running into the drain at the corner of Stonewell Lane. We will notify both DCC highways and Flood Team.